Tigi Solar

District Heating Feldbach – BigSolar​

TIGI

District Heating Feldbach – BigSolar

The pre-feasibility study for BigSolar Feldbach

First of all, utilities are forced to reduce natural gas consumtion. Secondly, biomass for district heating application lacks in availability on a long-term. Thirdly, biomass part-load performance is cost intensive and forces the utility to shut down the district heating network in the summer months. A deep-routed collaboration with the local utility, Energie Steiermark, led to a comprehensive evaluation in analyzing BigSolar for Feldbach.

SOLID ongoingly minds of the local stakeholders’ commitment as a crucial fundament for success. The boundary conditions and stakeholders needs are evaluated and feed the simulation based sensitivity analysis. BigSolar has shown to be integrated straight forward into existing district heating supply systems. SOLID proposes to find, together with the customer and all stakeholders, the best investment scenario. (doc science brunch)

The results show an adequate option for a strategic energy supply planning. As added value, SOLID detected optimization potentials that are integrated in the proposed action plan. 

The customer received an overall system approach analyzation, integrated measures to increase efficiency and to increase the renewable share at competitive to the existing heat price

More Case Studies

District Heating Liebenau in Graz The beginning of the history

Bioenergy Village Liggeringen Solar thermal for the solar energy village

Emek Israel Kibbutz Two systems – A water heating system