Tigi Solar

City of Banja Luka

Swimming Facility Incel​

TIGI

Swimming Facility Incel

Municipal swimming facility in Banja Luka 2009

A new municipal swimming pool was built in 2009 in Banja Luka, Bosnia. Through the existing partnership of the city of Banja Luka with the city of Graz, SOLID was given the opportunity to plan and install a large-scale solar plant together with Solar Graz, a subsidiary of Energie Graz.

The heat generated by the solar collectors warms the heating water via a plate heat exchanger. The collectors (1030 m2) are elevated on the flat roof of the building on a steel substructure.

Solar energy is stored in a 30 m³ steel tank. When the obtained solar thermal energy is not sufficient, the heat is supplied using a conventional water heater.

TIGI's Project Selection

More Case Studies

Galil Winery Solar thermal collectors and heat pumps. Customized water

SAP Integrated hot water solution for employee wellness and kitchen

SAP

SAP Integrated hot water solution for employee wellness and kitchen